How Rubber Flooring Impacts Costs

From classrooms to hallways, steady foot traffic and heavy rolling loads can quickly compromise a floor’s original beauty and integrity. With pressure to lower operational expenses, many institutions are turning to lifecycle cost analysis (LCCA) to determine which flooring material offers the greatest durability and resilience over the lifetime of the product, and how that directly translates to value and cost savings. Rubber flooring has proven to be a leader in this category. Here’s why.

Installation. The cost of installation (including labor and materials) varies greatly between flooring products. Rubber flooring with a self-adhesive backing can be installed directly over an existing floor. It has fewer seams with less cutting and joint sealing, resulting in faster turn-times, reducing your timeline by up to half.

Durability. The dense surface of rubber flooring can withstand the pressure of heavy loads, dragging desks and chairs, and is resistant to liquid spills and harsh chemicals. This level of ultra-durability is able to support a facility for decades.

Maintenance. Flooring maintenance can account for 75 to 90 percent of total cost over the product’s projected lifespan. Premium rubber flooring has a nonporous surface that repels stains and can be cleaned with little more than water. Unlike other resilient flooring, rubber’s uncoated surface means the floor never needs to be stripped and resealed.

Sustainability. Rubber flooring is naturally sourced and has a low-VOC rating, contributing to a healthier environment and improved indoor air quality (IAQ) for students and staff alike.

Premium rubber flooring has significant impact on total cost of ownership. Using LCCA during flooring specification helps institutions lower expenses long-term while increasing the health and safety of students, faculty, and staff.

This article originally appeared in the College Planning & Management June 2018 issue of Spaces4Learning.

About the Author

Tasha Hughes is a marketing specialist, PR, for nora systems, Inc. (www.nora.com/us). She can be reached at Tasha.hughes@nora.com or 800-332/NORA.

Featured

  • University of Kentucky Receives $2.5M Donation Toward Renovation Project

    The University of Kentucky in Lexington, Ky., recently announced that it has accepted a $2.5-million donation that will transform Pence Hall into the home of the university’s College of Communication and Information, according to a news release.

  • Minnesota District Completes Major Renovations, Expansions to High School

    White Bear Lake Area Schools in White Bear Lake, Minn., recently announced that it has completed the renovation and expansion of White Bear Lake Area High School, according to a news release. The school’s final addition, a new 845-seat Performing Arts Center, was finished in November.

  • Massachusetts Charter School Opens New Academic Building

    The Advanced Math and Science Academy Charter School (AMSA) in Marlborough, Mass., recently held a ribbon-cutting ceremony for a new academic building, according to a news release. The 17,000-square-foot space will serve as a classroom and science lab building for the student population of almost a thousand in grades 6–12.

  • Michigan School District Installs New Gun-Detection Platform

    Williamston Community Schools in Williamston, Mich., recently announced that it has installed the ZeroEyes gun-detection video analytics platform for its five schools, according to a news release. ZeroEyes is the only solution of its kind with a U.S. Department of Homeland Security SAFETY Act Designation and adds an AI gun-detection and intelligent situational awareness software layer into existing school security cameras.