Emory University: Emory Student Center

Emory University 

TOP/MIDDLE/BOTTOM RIGHT PHOTOS © KAY HINTON
TOP LEFT/MIDDLE PHOTOS © ANN WATSON, EMORY PHOTO/VIDEO EMORY PHOTO/VIDEO
EXTERIOR PHOTOS COURTESY OF DUDA|PAINE ARCHITECTS

The new Emory Student Center (ESC) on the campus of Emory University in Atlanta opened its doors in May. The innovative 130,000-square-foot facility houses an array of student-centered features including a high-tech gaming and recreation lounge; a spacious new food center; a convenience store; and innovative spaces for studying, collaboration, and student engagement.

In addition to providing a central location for student-centered services, the facility contains a large multipurpose space which can morph from a series of six meeting rooms into a sweeping ballroom that can hold up to 1,400 guests, with overflow space for another 200.

The ESC is separated into two distinct pavilions, connected by a windowed walkway. The south pavilion houses office space, the dining commons, and lounges. The north pavilion offers additional office space and lounges, storage space for clubs, and a multipurpose room large enough to seat a class together. To mitigate the project’s tremendous scale for the carefully curated context of Emory’s campus, Duda|Paine Architects positioned large portions of the building underground. This allowed tremendous synergies for operations and back-of-house functions to ensure a seamless student-side experience with striking aesthetics.

The central and highly visible placement of the building’s welcome desk within the design’s transparent, prismatic pavilions supports the desire to activate many campus pathways as means of entry rather than a single main entrance.

A sunshade canopy unifies the individual pavilions that together accommodate growing demand for student-oriented amenities, flexible dining, and space for student organizations, socializing, and gathering.

Duda|Paine worked with Emory University, Emory’s Office of Sustainable Initiatives (OSI) and with consultants Pattern R+D, Ecoworks, IMEG, and MHTN Architects throughout the design process to integrate elements and features that would further OSI guidelines. The facility is the first building on Emory’s campus to receive LEED Platinum certification.

This article originally appeared in the College Planning & Management October 2019 issue of Spaces4Learning.

Featured

  • Minnesota District Completes Major Renovations, Expansions to High School

    White Bear Lake Area Schools in White Bear Lake, Minn., recently announced that it has completed the renovation and expansion of White Bear Lake Area High School, according to a news release. The school’s final addition, a new 845-seat Performing Arts Center, was finished in November.

  • Illinois Elementary School Breaks Ground on Campus Expansion

    Heather Hill Elementary School, part of Flossmoor School District 161 in Palatine, Ill., recently broke ground on a new addition to the school focused on student support and security, according to a news release. The district partnered with Wold Architects & Engineers for the expansion as part of a longer-term facility planning and modernization initiative.

  • DreamBox Math

    Discovery Education Debuts Enhancements to DreamBox Math

    Discovery Education recently announced that DreamBox Math, an online math program for K–8 students to supplement core instruction, has been updated to improve accessibility for K–5 students, according to a news release. DreamBox Math provides personalized instruction by adapting to individual learners’ responses and providing an engaging, dynamic learning environment.

  • Florida Elementary School to Undergo $47M Reconstruction

    The School District of Osceola County in Kissimmee, Fla., recently announced a partnership with construction firm Skanska to reconstruct Reedy Creek Elementary School, according to a news release. The $47-million project will involve the new construction of a 96,000-square-foot academic center, renovating the remaining facilities, a full-site redevelopment, and demolishing portions of the existing school.