Grand Canyon U Students Help Build COVID-safe Outdoor Theatre

Faculty, staff and students at Grand Canyon University's College of Fine Arts and Production have constructed an outdoor theatre for use this play season, which addresses COVID-19 restrictions while still allowing students (and their audiences) to enjoy live productions. During the first production, The Comedy of Errors, students wore clear face masks.

The project, which took about a month, called on student workers and cast members to pitch in on construction of the stage, which is located on the lawn in front of the college's building.

The university reported that stage lighting will resemble that of a café. Photo by David Kadlubowski, GCU News Bureau

The 40-foot stage is surrounded by designated seating areas for audience members, allowing families to sit together while also remaining distanced from others. The lighting resembles an outdoor café. The set also has a booth for controlling stage lighting and sound. All plays will be livestreamed for people who prefer to watch from home. The first production is already available for viewing on GCU's YouTube channel.

"It's much different than one of our standard builds for a theatrical show because we don't normally have to build an entire theatre," said Technical Director Brad Cozby in a college article.

Cozby said he worked with the college's Dean, Claude Pensis, and Assistant Dean, William Symington, on the effort. "There were a lot of talks among the three of us on how we could make something like this happen," Cozby said. "I was given a list of objectives for what the stage needed to accommodate, and then I took that and worked through the engineering of it all."

"I think that artists and particularly performing arts folks are used to being adaptable," Symington added. "Creative problem-solving is literally what we do every day. When we're working on a project, it's never sort of a set situation where we're like, 'Oh we'll just do it the same way as we've always done it.' It never works that way."

Cozby said his favorite part of the initiative was working alongside students. "They've really thrown themselves into this project whole-heartedly," he noted. "It's just been an absolute joy to work with them and make all of this happen."

About the Author

Dian Schaffhauser is a former senior contributing editor for 1105 Media's education publications THE Journal, Campus Technology and Spaces4Learning.

Featured

  • College of the Mainland Starts Construction on New Library & Learning Center

    College of the Mainland in Texas City, Texas, recently held a groundbreaking ceremony for its new Library & Learning Center, according to a news release. The new facility is part of a larger, $250-million campus expansion project funded by a 2023 bond program.

  • Gretna East High School

    Gretna East High School

    Established in 1999, the Education Design Showcase is a vehicle for showing off innovative — yet practical — solutions in planning, design, architecture, and construction. Gretna East High School has been recognized with an EDS 2025 Project of Distinction award in the category of New Construction.

  • Schools In Focus: Talking Campus Security with Mitch McKinley

    Furnishing the Future: Adaptive Solutions for Modern Learning Spaces

    On this episode of Schools in Focus, we'll talk about the role that classroom furniture plays in creating adaptive, flexible learning spaces. Our guest is Wesley Edmonds, the Director of Workplace, Adaptive Solutions at OFS.

  • Greenheck Receives Sourcewell Cooperative Contract

    Air movement, control, conditioning, and distribution equipment solutions provider Greenheck recently announced that it has been awarded a Sourcewell cooperative purchasing contract, according to a news release. The HVAC Systems contract will allow Greenheck the opportunity to expand opportunities in government procurement and other public agencies in North America.

Digital Edition