Kraus-Anderson Finishes $21.4M, Two-School Renovation Project

Kraus-Anderson in Duluth, Minn., recently announced that it has completed a $21.43-million addition and remodel of two facilities for Ely Public Schools in Ely, Minn. The district consists of Ely Memorial High School and Washington Elementary School, which serve a combined total of about 550 students, according to a news release. The project involved 110,500 square feet of renovation work total, including a 71,000-square-foot remodel of the two schools, according to a news release.

“The project added a new 39,000-square-foot commons area that creates a connection link between the high school and the elementary school,” said Todd Erickson, senior project manager at Kraus-Anderson. “The area also contains a safe and secure entry system, school district offices, and high-school and elementary offices.”

Ely Public Schools Renovation Addition
Image courtesy of Shore to Shore Communications, Inc.

The new space includes CTE classrooms, a media center, gymnasium, music room, metals shop and wood shop, and a new cafeteria with upgraded kitchen equipment, the news release reports. The high school gained new boys’ and girls’ locker rooms, the elementary school a new Early Family Childhood Education (ECFE) area, and both received new HVAC systems.

Construction started in May 2021, and the school district also partnered with Architectural Resources, Inc., for the design.

“In addition to budget, staffing, and supply-chain challenges brought about by COVID-19, crews discovered 1,700 cubic yards of ledge rock, which had to be blasted and excavated to allow installation of new utilities,” Erickson said.

About the Author

Matt Jones is senior editor of Spaces4Learning. He can be reached at mjones@1105media.com.

Featured

  • Tennant Company Launches Autonomous Floor Scrubber

    Cleaning equipment and solutions provider Tennant Company recently launched the new X6 ROVR, a mid-sized robotic scrubber designed for large commercial and light-industrial environments, according to a news release. The autonomous machine can clean up to 75,000 square feet peer cycle with minimal needs for manual assistance.

  • ProTeam Launches GoFit 6 HEPA Backpack Vacuum

    Technology leader Emerson recently introduced the new ProTeam GoFit 6 HEPA backpack vacuum, according to a news release. The vacuum was designed to capture 99.97% of particulates down to 0.3 microns—including atmospheric hazards like lead dust, mold spores, and other particulates—through an advanced filtration system.

  • Kimball International Launches Season 5 of Alternative Design Podcast

    Commercial furnishings manufacturer Kimball International recently premiered the fifth season of its Alternative Design podcast, according to a news release. The first episode was released on March 17, and new episodes will launch monthly. The podcast discusses forces that shape built environments, from work to housing to healthcare to human wellness.

  • Active Learning Classroom

    Striking a Balance: The Keys to Renovating Science Education Buildings for the 21st Century

    The recent renovation of the Durham Science Center at the University of Nebraska-Omaha (UNO) provides a roadmap for facilities managers tasked with balancing budget constraints, modern pedagogical demands, and long-term sustainability.

Digital Edition