Delivering Around-the-Clock Power

gas generator

To ensure the power is always on, the Edward Via College of Osteopathic Medicine installed a Cat G3412 gas generator to back up the utility feed at the Auburn, AL, campus.

On a branch campus of Virginia Tech in Auburn, AL, the Edward Via College of Osteopathic Medicine (VCOM) opened its doors with a vision to provide healthcare for nearby underserved regions while promoting biomedical research. In a state-of-the-art building on the southern end of the Auburn campus, more than 325 VCOM first-and second-year students are taught the fundamentals of osteopathic medicine. VCOM’s curriculum is based on a digital platform so continuous power is critical.

To ensure uninterrupted power, VCOM installed a Cat G3412 gas generator to back up the utility feed at their Auburn campus when the building first opened. Based on a recommendation from Cat dealer Thompson Tractor, VCOM transfers the electrical load to the facility once a month.

“Every time, the generator has kicked right in and done what it’s supposed to do,” says Randy Cerovsky, facilities director for VCOM-Auburn. “We have never noticed any delay in the amount of time it takes for the generator to start up and transfer the power over. Everything just runs smoothly; we’ve never had any issues.”

Technicians from Thompson Power Systems perform regular maintenance on the generator set. “Thompson Power Systems has been great to work with,” Cerovsky says. “They do all of the service, and they explain everything.”

Cerovsky receives email alerts when the generator runs or if issues arise. “One of the features I like is the Cat Connect interface that enables us to receive SMTP alerts so if anything’s wrong, we get notified and call to receive service immediately.”

www.cat.com/en_US

This article originally appeared in the College Planning & Management September 2019 issue of Spaces4Learning.

Featured

  • College of the Mainland Starts Construction on New Library & Learning Center

    College of the Mainland in Texas City, Texas, recently held a groundbreaking ceremony for its new Library & Learning Center, according to a news release. The new facility is part of a larger, $250-million campus expansion project funded by a 2023 bond program.

  • Gretna East High School

    Gretna East High School

    Established in 1999, the Education Design Showcase is a vehicle for showing off innovative — yet practical — solutions in planning, design, architecture, and construction. Gretna East High School has been recognized with an EDS 2025 Project of Distinction award in the category of New Construction.

  • Schools In Focus: Talking Campus Security with Mitch McKinley

    Furnishing the Future: Adaptive Solutions for Modern Learning Spaces

    On this episode of Schools in Focus, we'll talk about the role that classroom furniture plays in creating adaptive, flexible learning spaces. Our guest is Wesley Edmonds, the Director of Workplace, Adaptive Solutions at OFS.

  • Greenheck Receives Sourcewell Cooperative Contract

    Air movement, control, conditioning, and distribution equipment solutions provider Greenheck recently announced that it has been awarded a Sourcewell cooperative purchasing contract, according to a news release. The HVAC Systems contract will allow Greenheck the opportunity to expand opportunities in government procurement and other public agencies in North America.

Digital Edition