Winter Meets Its Match

rubber flooring

Syracuse’s harsh winter weather has met its match at Syracuse University with the installation of rubber flooring rubber flooring in residential entrance areas, corridors, common spaces, and stairwells.

Syracuse University in New York has its hands full educating 21,000 students each year. With 70 percent of those students living on campus in 22 residence halls, the university’s housing team has a lot to contend with, including comfort, safety, and upkeep.

Two big challenges? The brutal Syracuse winters and the constant, high-volume traffic within dorm buildings. The housing team needed a floor that could stand up to both. They selected nora® by Interface® rubber flooring to cover dorm entrance areas, corridors, common spaces, and stairwells. Over the past seven years, the floor has outperformed expectations. “The versatility of rubber lends itself to many different spaces,” says Robert J. Spagnoletti, manager of maintenance, “and it performs in all of them, functionally and aesthetically.”

The floor’s easy maintenance regimen played a key role in the selection of rubber—no wax or coating necessary. “That was a main driving factor,” says Spagnoletti. “We found a good product that we don’t have to wax and strip.” Since installation, the floor has delivered on performance—the Syracuse maintenance team’s toughest obstacle.

“Our biggest challenge is the winters and dealing with the snow and salt, keeping the salt down outside, but minimizing the trailing effect inside,” Spagnoletti shares. The nora rubber flooring has performed so efficiently that the maintenance team is using spare tiles as walk-off pads for elevators during the winter.

“We’re getting strong support from all of our directors. They see the areas where nora has been installed and are happy with how it’s worked,” Spagnoletti says.

www.interface.com

This article originally appeared in the College Planning & Management September 2019 issue of Spaces4Learning.

Featured

  • College of the Mainland Starts Construction on New Library & Learning Center

    College of the Mainland in Texas City, Texas, recently held a groundbreaking ceremony for its new Library & Learning Center, according to a news release. The new facility is part of a larger, $250-million campus expansion project funded by a 2023 bond program.

  • Gretna East High School

    Gretna East High School

    Established in 1999, the Education Design Showcase is a vehicle for showing off innovative — yet practical — solutions in planning, design, architecture, and construction. Gretna East High School has been recognized with an EDS 2025 Project of Distinction award in the category of New Construction.

  • Schools In Focus: Talking Campus Security with Mitch McKinley

    Furnishing the Future: Adaptive Solutions for Modern Learning Spaces

    On this episode of Schools in Focus, we'll talk about the role that classroom furniture plays in creating adaptive, flexible learning spaces. Our guest is Wesley Edmonds, the Director of Workplace, Adaptive Solutions at OFS.

  • Greenheck Receives Sourcewell Cooperative Contract

    Air movement, control, conditioning, and distribution equipment solutions provider Greenheck recently announced that it has been awarded a Sourcewell cooperative purchasing contract, according to a news release. The HVAC Systems contract will allow Greenheck the opportunity to expand opportunities in government procurement and other public agencies in North America.

Digital Edition