Black Rock Middle School

Spiezle Architectural Group, Inc.

Honorable Mention 2023 Education Design Showcase

Black Rock Middle School

Project Information

Facility Use: Middle School
Project Type: New Construction
Category: Whole Building / Campus Design
Location: Pennsylvania
District/Inst.: Lower Merion School District
Chief Administrator: Megan Shafer, Acting Superintendent
Completion Date: 08/01/2022
Gross Area: 208,300 sq. ft.
Area Per Student: 173.6 sq. ft.
Site Size: 22 acres
Current Enrollment: 1,000
Capacity: 1,200
Cost per Student: $73,876
Cost per Sq. Ft.: $425.59
Total Cost: $88,651,233

Black Rock Middle School

With Lower Merion School District's student population on the rise, the existing schools were reaching maximum capacity. The new Black Rock Middle School alleviates overcrowding at the elementary schools by moving fifth grade out of the elementary buildings and overcrowding at the middle schools by spreading the middle school population among three buildings instead of two.

Black Rock Middle School

The new 215,000 SF school is centered around a two-story "heart" space with a gathering stair that opens onto an educational courtyard overlooked by the media center. Complementary educational spaces include 12 collaborative learning communities, art, science, music, physical education and a state-of-the-art theater designed to provide an innovative learning experience for up to 1,200 students.

Black Rock Middle School

Black Rock Middle School is organized to provide convenient community access from entrances along the south while students have a safe and secure entry from the north. It is "zoned" with the ability to compartmentalize spaces for various educational and community activities. Twelve [12] Learning Communities span amongst three floors, with ease of access to specialty spaces and technology. Each Learning Community is equipped with a variety of spaces for large-group team teaching, small group instruction or student collaboration and breakout. This allows teachers and students the ability to quickly shift between various modes of learning and creates a highly personalized learning experience for every student.

Black Rock Middle School

Black Rock Middle School

Features include a welcoming school "Heart" that connects the lower-level dining hall via a gathering stair — a multi-functional gathering and performance feature. The theater has flexible/retractable seating to accommodate performances with over 600 spectators but can also be divided into 3 smaller spaces for day-to-day use. A second gathering stair connects the 2-story library that bridges over the exterior courtyard. Other specialty learning spaces include a digital lab, tech workshop, student gallery, movement arts & fitness studio and family consumer science labs. Great importance in the design has been placed on mental health and wellness.

Black Rock Middle School

Black Rock Middle School

Architect(s):

Spiezle Architectural Group, Inc.
Scott Downie, AIA, LEED AP
248-703-3681

Featured

  • New Jersey High School Debuts Auditorium Renovation, Technical Upgrades

    Plainfield High School in Plainfield, N.J., recently completed a series of construction projects including an auditorium renovation, a new eSports gaming arena, and a black-box theater, according to a news release. The school partnered with PureTek Group to install the Pliant Technologies CrewCom professional wireless intercom system.

  • All Surfaces Announces New Director of Commercial Business Development

    Surface solutions provider All Surfaces recently announced that it has hired a new Director of Commercial Business Development in Torie Bonafede. Bonafede will work to build the company’s market presence in various categories and drive strategic initiatives to expand its commercial sales portfolio.

  • Massachusetts High School to Build New Athletics Facility

    Middlesex School, which serves boarding and day students in grades 9–12, recently moved forward with plans to build a new athletics facility for its campus in Concord, Mass., according to a news release. MassDevelopment recently issued a $43.7-million tax-exempt bond to fund the project.

  • How Data Increases Community Confidence in School Facilities

    In school districts across America, the start of a new school year is met with optimism and new beginnings. But as the back-to-school excitement wears off, it recedes to the reality that many school facilities are in the same state of infrastructural decline that they’ve faced for years, if not decades, as these facilities deteriorate.

Digital Edition